Smart scheduling

Balance people, machines and materials automatically against real constraints.

machine utilization
idle time and rush overtime
min
to re-plan a changed order

Scheduling is a constraint problem a spreadsheet cannot really hold: orders, machine capacity, manpower and material all move at once. A solver proposes a schedule that respects the real limits, and the planner keeps the final say.

How it works
  1. Ingest orders, capacity, manpower and material constraints.
  2. Optimize against due dates, changeovers and utilization.
  3. Propose a schedule the planner can adjust.
  4. Re-plan quickly when an order or a machine changes.
Inputs
  • Open orders and due dates
  • Machine capacity and manpower
  • Material availability
Outputs
  • A prioritized, constraint-aware schedule
  • Overtime and utilization estimates
  • Fast re-plans when things change
Where it fits

High-mix shops where manual scheduling leaves machines idle or people on avoidable overtime.

Governance & standards

We design and deploy to the ISO/IEC 27001 (information security) and ISO/IEC 42001 (AI management system) frameworks. Data stays where it should, decisions that carry real cost keep a human in the loop, and every model call is logged for audit.

ISO/IEC 27001
Information security management
ISO/IEC 42001
AI management system

Designed and deployed to these frameworks. Not a certification claim.

Contact

Have a problem like this?

Bring your messiest operational problem. In 30 minutes we will tell you where AI would pay back fastest, and where it would not.

Discuss an operations problem